On-Going Projects

  • Sl.No CLient/Consultant Project Contractor
    1 SEC (NG) NEW AL KHESHEL 132kv/13.8 SS Jazan (ONGOING PROJECT) SIEMENS
    2 ARAMCO Fiber optic testing, splicing and termination Jazan Refinary in the economic city. (ONGOING PROJECT) DAEWOO
    3 Petro Rabigh LV & MV testing and commissioning in Pitro Rabigh. ONGOING PROJECT BAYTUR
    4 ARAMCO testing for 30 MV Trafo Jazan Refinary in the economic city ONGOING PROJECT DAEWOO
    5 SEC (NG) DUBA power plant under negotiation with Mr. Gonzalez Santiago INTEC Energia- SSEM
    6 SEC (NG) Retrofitting protection relays MV Protection. ONGOING PROJECT ABB

Accomplished Projects

  • Sl.No CLient/Consultant Project Contractor
    1 ARAMCO Shayba site empty quarter GOSP
    * Retrofit and terminations for automation panels and protection relays related to GOSP -1 Substation.
    * testing and commissioning of automation panels related feeder protections.
    * Modifications and software upgrading (SEL PROTECTION RELAYS) for the total system of the substation.
    2 PGCS * All types for electrical testing for 13.8 kv SWGR such as:
            • HIPOT FOR THE BUSBAR,
            • CB TIMING,
            • Primary injection,
            • CT and VT TEST RATIO VERIFICATION AND etc……,
            • Secondary injection,
            • BUSBAR INSULATION TEST,
            • CR TEST,
            • 13.8KV CABLE TESTING,
            • TESTING FOR SCHNIEDER PROTECTION RELAYS,
            • Commissioning for the13.8kv SWGR panels.
    3 ARAMCO Wasit gas program site Khorasanya area
    * Retrofit and terminations for automation panels and protection relays related to GOSP -1 Substation.
    * testing and commissioning of automation panels related feeder protections.
    * Modifications and software upgrading (SEL PROTECTION RELAYS) for the total system of the substation.
    4 Saudi Electricity Co. (SEC) Supply & installation of Emergency D.G & ATS at SEC operational office - South
    * Testing & commissioning of Diesel Generator Set 250 KVA, 400V/230V
    * Testing & commissioning of ATS 800A
    * Testing of LV cables
    5 Riyadh Health Affairs Electrical Power supply for Admin Building at New Artaweyah Hospital
    * Testing & commissioning transformer 1000 KVA, 13.8/0.4 KV
    * Testing & commissioning RMU, 3-WAY, 13.8 KV
    * Testing & commissioning MV cables
    6 ARAMCO AL Othmania site 33 substation retrofitting and new protection panels
    * Installation for new protection panels (automation panels).
    * Removing the old protection panels.
    * Cable pulling and termination for that cables as per the schedule.
    * Testing and commissioning for the protection relays (SEL 411L, 451, 487E, 311L, GE L90 as per ARAMCO standard.
    * PSA signals from the field and from the protection panels.
    * RTU signals from the field up to Al Dhaharan centr ARAMCO
    7 ARAMCO Dammam port SAIPEM ( MURGAN and ZULUF PLATFORM ) 115kv GIS ( HITACHI) 3 bay, 13.8 kv SWGR WESCOSA 20 panels, 480v SWGR
    * Installation supervision of protection panels.
    * Preparation, documentation, configuration, processing of setting of the relays installed in the protection panels.
    * Pre- commissioning, commissioning and energization on plat form of protection panels as per SA ARAMCO standard.
    * On site commissioning support
    * Protection panel scheme verification as per Protection panels drawing (alarm/operation/status).
    * Testing Numerical relays of Line differential protection, Transformer Differential protection and Bus Bar Differential Protection Relays (SEL-311L,GE L90, SEL451 , SEL487E,SEL587Z and SEL751 ).
    * Testing of numerical relays P143 ALASTOM for480v.
    * Transformer stability for 115kv/13.8kv TRAFO.
    * Bus bar stability for 115kv GIS.
    * 115kv LCC function test.
    8 ARASCO Dammam Port (Arasco Factory )
    * Installation and supervision for 13.8kv SWGR.
    * All types for electrical testing for 13.8 kv SWGR such as:
            • HIPOT FOR THE BUSBAR,
            • CB TIMING,
            • Primary injection,
            • CT and VT TEST RATIO VERIFICATION AND etc……,
            • Secondary injection,
            • BUSBAR INSULATION TEST,
            • CR TEST,
            • 13.8KV CABLE TESTING,
            • TESTING FOR SCHNIEDER PROTECTION RELAYS,
            • Commissioning for the13.8kv SWGR panels.
    * Total support up to successful energization of the total system and steady state condition.
    9 Al Jubail Royal commission Jubail AZMEEL ongoing project :
    * All types for electrical testing for 13.8 kv SWGR such as:
            • HIPOT FOR THE BUSBAR,
            • CB TIMING,
            • Primary injection,
            • CT and VT TEST RATIO VERIFICATION AND etc……,
            • Secondary injection,
            • BUSBAR INSULATION TEST,
            • CR TEST,
            • 13.8KV CABLE TESTING,
            • TESTING FOR SCHNIEDER PROTECTION RELAYS,
            • Commissioning for the13.8kv SWGR panels.
    Total support up to successful energization of the total system and steady state condition.
    10 ARAMCO * All types for electrical testing for 13.8 kv SWGR such as:
            • HIPOT FOR THE BUSBAR,
            • CB TIMING,
            • Primary injection,
            • CT and VT TEST RATIO VERIFICATION AND etc……,
            • Secondary injection,
            • BUSBAR INSULATION TEST,
            • CR TEST,
            • 13.8KV CABLE TESTING,
            • TESTING FOR SCHNIEDER PROTECTION RELAYS, Commissioning for the13.8kv SWGR panels.
    PGCS